Jump to content

PMC Operation


Recommended Posts

The PMC is the "power management computer "of the engines. It is normally always on. It does stuff like keeping the engines at climb power while it climbs automatically and provides overspeed protection and such.

If it is faulty the plane CAN be flown with it off (I did that once), but the switch is in the lower nose compartment.

We do not model operation without it.

Cheers, Jan

 

  • Like 1
Link to comment
Share on other sites

14 hours ago, Litjan said:

The PMC is the "power management computer "of the engines. It is normally always on. It does stuff like keeping the engines at climb power while it climbs automatically and provides overspeed protection and such.

If it is faulty the plane CAN be flown with it off (I did that once), but the switch is in the lower nose compartment.

We do not model operation without it.

Cheers, Jan

 

Thank you for your reply, it really helped me :)

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...